Buckreef 33kV power-line relocation

Buckreef 5.5km 33kV line relocation

Re-routing an existing MV supply around expanding mine infrastructure while protecting continuity and safety.

August 2023–November 2025Gold MiningMnekezi, Geita

Project Overview

Moving critical power infrastructure for mine expansion

KELM relocated 5.5km of existing 33kV overhead line at Buckreef Gold Mine to clear areas required for mining operations and infrastructure development.

The scope combined route planning, new line construction, dismantling, re-erection, reconnection and full testing, with the work sequenced around the mine's requirement for dependable power.

Client
Buckreef Gold Company Ltd
Programme
August 2023 · November 2025
Location
Mnekezi, Geita
System
33kV Medium Voltage overhead line
Route Length
5.5km relocation

What KELM Did

Built the new route and transferred the operating line

Route Planning

Surveyed and established a new corridor compatible with active and planned mine development.

New Line Construction

Installed poles, conductors, hardware and associated protection across the 5.5km route.

Dismantling & Re-use

Safely removed existing line components and coordinated re-erection and replacement work.

Reconnection & Testing

Integrated the relocated line, completed electrical tests and returned the system to operation.