Strengthening power supply for essential water services

KELM constructed and extended the Medium Voltage overhead network serving the Butimba Wastewater Treatment Plant and its associated raw-water pumping station. The completed arrangement included a 0.8km section feeding a 2,000kVA 11/0.4kV transformer and a 0.7km section feeding a 400kVA 11/0.4kV transformer.

The work brought together line construction, armoured cable installation, transformer substations, protection, earthing, testing and coordinated commissioning.

Client
MWAUWASA
Programme
Started 2023 · Completed 2024
Location
Butimba, Mwanza
System
MV overhead line with 2,000kVA and 400kVA transformer substations
Application
Wastewater treatment and raw-water pumping

What KELM Did

Complete delivery from line route to handover

MV Line Construction

Erected poles, strung ACSR conductors and installed crossarms, insulators, lightning arresters and line hardware.

Substation Installation

Installed transformer substations, MV armoured cables and the associated electrical interfaces.

Protection & Earthing

Installed isolators, drop-out fuses, surge protection and strategic earthing for operator and equipment safety.

Testing & Handover

Completed insulation, continuity and earth tests, coordinated commissioning and supplied as-built records.