Route & Structures
Set out the route and installed treated wooden poles across the 800m extension.

A dedicated supply system built to support mining operations in Shinyanga.
Project Overview
KELM constructed an 800m, 33kV overhead distribution line on treated wooden poles and established an 800kVA 33/0.4kV transformer substation for Zheng Ze Tian Chen Mining Company Limited.
The system was designed to provide a stable and efficient electrical source for mining operations, bringing line construction, switching, protection and transformer installation into one delivery scope.
What KELM Did
Set out the route and installed treated wooden poles across the 800m extension.
Completed ACSR stringing, tensioning, sagging and line terminations.
Installed drop-out fuses, surge protection and switching equipment.
Installed the transformer, earthing system, lightning protection and distribution interfaces.
Project Photos




KELM can coordinate the complete line and substation scope.