800kVA transformer substation at Mwazimba

Mwazimba 33kV line and 800kVA substation

Design, supply and construction of a complete MV connection supporting increased load capacity.

February–June 2025MiningMwazimba, Shinyanga

Project Overview

Power connection for the Mwazimba CIP plant

KELM delivered a 3.54km, 33kV overhead line and a new 800kVA 33/0.4kV transformer substation for Nestory Makune's CIP operation. The installation connected the processing site through a dedicated transformer substation.

The project combined line structures, ACSR conductors, switchgear, transformer installation, earthing and lightning protection in one coordinated package.

Client
Nestory Makune (CIP)
Programme
February 2025 · June 2025
Location
Mwazimba, Shinyanga
Line
3.54km of 33kV overhead infrastructure
Substation
800kVA, 33/0.4kV transformer

What KELM Did

Line construction and substation installation

Design & Supply

Coordinated system requirements, route, structures, conductor and substation equipment.

33kV Construction

Installed line poles and strung ACSR conductors across the 3.54km route.

Substation & Switchgear

Installed the 800kVA transformer and switching equipment for control and fault isolation.

Safety Systems

Delivered the earthing and lightning protection required for personnel and asset safety.