Pole erection for the SOTTA PAP power project

SOTTA PAP power distribution system

A complete 33kV and low-voltage network supplying relocated residential houses at Nyanzaga.

May–June 2025Mining Community InfrastructureNyanzaga

Project Overview

Safe, reliable power for relocated households

KELM delivered a complete distribution system for Project Affected Person houses associated with SOTTA Mining Corporation. The project combined 1.3km of 33kV overhead line, a pole-mounted transformer and approximately 1km of low-voltage distribution.

The programme moved from survey and detailed line layout through construction, utility coordination, testing and final handover within May and June 2025.

Client
SOTTA Mining Corporation
Programme
May 2025 · June 2025
Location
Nyanzaga, Tanzania
MV Scope
1.3km of 33kV overhead line
LV Scope
1km distribution network serving PAP houses

What KELM Did

Designed and built the complete distribution route

Survey & Pegging

Completed route survey, line layout, structure positions and detailed implementation planning.

33kV Construction

Excavated pole pits, erected structures, dressed poles and installed ACSR conductors.

Transformer & LV Network

Installed the pole-mounted transformer and three-phase and single-phase LV distribution.

Commissioning

Installed earthing and protection, coordinated with TANESCO and completed testing and handover.